I got a good start today; here's what I did:
- Took down cabinet doors, removed drawers, took hinges and knobs off
- Removed toilet paper holder
- Removed the two doors, removed the doorknobs and removed the hinges
- Filled holes in cabinet with wood putty and sanded
- Disconnected faucet pipes and removed top of cabinet and sink
- Removed shoe mold
- Sanded the woodwork and window
- Primed all of the woodwork including the cabinet, inside and out
- Removed the vent cover from the ceiling and took the light loose
- Repaired the sheetrock up on the ceiling and where the backsplash had been.
Tomorrow I plan to:
- Prime the doors and cabinet doors (outside so it isn't so stinky)
- Sand the sheetrock repair and prime the ceiling part
- Paint the ceiling
- Sand and spray prime/paint the door hinges and screws
- Maybe prime and paint the doorknobs
- If I have any energy after that, I may sand the woodwork in the bathroom.
I am also going to go get some plywood to build up the bottom of the cabinets and some wood to make a divider between some of the cabinet doors so that I can put a shelf in there and use baskets instead of having four cabinet doors; I'll only have two.
Now I think it is time to relax and hopefully get to sleep.
No comments:
Post a Comment